Active Bids

If you plan on bidding on any Project you are REQUIRED to fill out the Plan Holders Submittal Form to be placed on the Plan Holders list in order to be notified of any changes.

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Friday, September 18, 2026

Engineering

Resurfacing E Street in conjunction with the City's Pioneer Spirt Trail Project

WEC 1 Aux Boiler Tube Replacement HU 2026-80

Tuesday, September 8, 2026

Engineering

Contractor to provide craft labor, supervision, equipment and materials necessary to replace WEC Unit 1 Aux Boiler Tubes in accordance with the project specifications.

DHPC PDC 13.8KV Switchgear (Re-bid) HU 2026-49

Friday, September 4, 2026

Engineering

Manufacture and full integration of new switchgear into a dedicated Power Distribution Center (PCD), with the complete preassembled unit tested and delivered to the Don Henry Power Center.

Parkview Cemetery Paving Phase 6 CH 2026-38

Friday, June 26, 2026

Engineering

Removing and disposing of the existing asphalt surfacing and construction of appx 6,100 SY of 6-inch P.C.C. pavement with a fly ash stabilized subgrade including other associated work to complete the project in Hastings, NE.