Active Bids

If you plan on bidding on any Project you are REQUIRED to fill out the Plan Holders Submittal Form to be placed on the Plan Holders list in order to be notified of any changes.

Don Henry Power Center Generator Excitation Replacement HU 2026-103

Tuesday, November 10, 2026

Engineering

Design, build, install, test and commission a new generator excitation system for the gas turbine at Don Henry Power Center in Hastings NE

WEC 1 Aux Boiler Tube Replacement HU 2026-80

Tuesday, September 8, 2026

Engineering

Contractor to provide craft labor, supervision, equipment and materials necessary to replace WEC Unit 1 Aux Boiler Tubes in accordance with the project specifications.

DHPC PDC 13.8KV Switchgear (Re-bid) HU 2026-49

Friday, September 4, 2026

Engineering

Manufacture and full integration of new switchgear into a dedicated Power Distribution Center (PCD), with the complete preassembled unit tested and delivered to the Don Henry Power Center.