Administration
2023 - 12th Street Corridor Study
The City of Hastings desires to improve W 12th Street between Nalan Drive and N Hastings Avenue. With the newer subdivisions along the corridor, specifically at the western city limits, and the redevelopment of the Theater District southwest of the intersection of W 12th Street & N Marian Road, safety and capacity of the corridor needs to be reevaluated.
The W 12th Street Corridor Study included traffic analysis and conceptual design of the corridor, including intersection, street, and sidewalk/trail improvements. The primary goal of the study was to establish projects along the corridor, ranked by priority, that could be constructed individually by the City.